
The Woden Interchange is about to open – and it’s also a little too open. Photo: Ian Bushnell.
Last Friday’s foretaste of winter – replete with wind, rain and chill factor – would have had Woden’s public transport users wondering about the shortcomings of the new interchange due to open in April.
Especially as they took shelter at the temporary shipping container interchange on the old Matilda Street carpark, which will be turned into a multi-storey mixed-use development by the Hellenic Club when the buses depart forever.
As one Region commenter noted, there’s more shelter from the elements there than what will be available at the new interchange.
The ACT Government was warned in the consultation phase that the design would not be weather-resistant enough, and it conceded the point by adding more shelter.
Unfortunately, it appears to still be too exposed to the searing summer sun and the knife-edged winds and winter rains that will inevitably blow in at alarming angles, making a mockery of the platform roofs, which look great but will have little utility.
This is a shame because the interchange, which will eventually cater for light rail, was much needed to replace the old, rambling edifice and was much anticipated and expected to encourage more Canberrans to leave the car at home.
The interchange, as the name suggests, is not just a place of departure and destination, but also where travellers change buses and platforms, or stop at the Town Centre as part of their journey. This should require a degree of comfort and convenience.
Transport Minister Chris Steel says the new interchange is everything the old one was not – open, accessible, light-filled and safe, with trees to provide greenery and shade.
But it seems just a bit too open.

How passengers respond to the new interchange will influence its design future. Photo: Ian Bushnell.
Next month, it will take its first buses with much fanfare, but it will also invite criticism every time the weather turns nasty.
The design could not have been weatherproof – that would have required a below-ground facility – but more attention could have been given to providing an overarching roof (I have visions of a spectacular skyscape seen above European railway stations) or at least more coverage along the length of the platforms, and more respite space out of the elements.
There will always be those who want to bag Transport Canberra and the government, but unfortunately, in recent times, they have given the community little cause not to do so, with the MyWay+ launch debacle still rankling.
It is another example of the government not really listening to the community and persisting with an underdone project.
We don’t even know how much it cost, given the interchange was enmeshed in the CIT project, a fine building that deserved a better-designed and more people-friendly neighbour, given it was supposed to be an integrated project.
Mr Steel will face obvious complaints from the people who will actually use the facility because it isn’t up to scratch.
Like other projects before it, the government will try to ignore these until it is mugged by reality and has to augment the design to fix the flaws that the weather has exposed, and that will come at considerable cost.
For all the excitement about a long-awaited and important piece of infrastructure now being completed, it seems the government has forgotten that the interchange is not just for buses and the network, but for the people who ride them.
















