
Canberra developer Core Developments acquired the three blocks in the Belconnen Town Centre. Photo: SLA.
An 18,000 sqm parcel of public land in the Belconnen Town Centre has been sold for $18 million at auction.
Canberra developer Core Developments was the sole bidder for Belconnen Precinct on Emu Bank, previously known as the Circus Sites (Section 151 Block 2; Section 52 Block 38; Section 52 Block 39).
It came with a yield of 750 units and 4000 sqm of commercial space.
The Suburban Land Agency and ACT Treasury should be somewhat relieved by the sale, after developers shied away from the recent auction of a prime corner block in Wright that failed to attract a bid.
It is understood that Core offered $17 million but agreed to the $18 million reserve. The land will require about $12 million in off-site works, bringing the investment per unit to $40,000, which is in line with market expectations.
In 2021, the land was part of an omnibus release called Belconnen Lakeshore, which also included the Former Belconnen Water Police site (Block 29 Section 149 Belconnen) at Emu Inlet Waterfront.
The SLA had opted for a two-stage expression-of-interest process but withdrew the sites from the market in 2022.
To make the site more attractive, it boosted the residential yield by a half beyond the number of homes specified in the 2021 Place Design Brief, which is supposed to guide its development.
While the Place Design Brief will guide development, the land went to auction with fewer conditions, such as the previously mandated 5 Green Star building requirement, more flexibility and 250 more apartments than the 500 listed in the Design Brief.
When the auction was announced back in June, Belconnen Community Council had concerns that amenity would be sacrificed for yield.
BCC chair Lachlan Butler said on Monday that the sale was welcome and that, from all reports, Core would do a good job with the land.
But Mr Butler said the council would still prefer the EOI process to auction to ensure a better public realm.
While the Design Brief did not bind Core, Mr Butler hoped it still influenced the eventual proposal.
“A lot of people took a lot of time out of their own time to participate in consultation for that, and people thought that the Place Design Brief was pretty good,” Mr Butler said.
He said the SLA probably hoped Core did, too, because if not, the Agency’s reputation and ability to attract genuine engagement on future projects would suffer.
“Why would people engage with the SLA on stuff if a couple of years later it’s just all going to be thrown out,” Mr Butler.
He said the Design Brief described what the public realm should look like, what the commercial offering should be, and how to ensure it’s a livable place for residents and for people who visit or live nearby.
“We don’t want to see all of that take a hit, just because the yield’s gone up,” Mr Butler said.
The SLA earlier said detailed planning had shown the sites could support up to 750 homes, which was consistent with the Belconnen District Policy requirements and building heights.
This allowed for 12 storeys (42 metres) and would help increase housing supply and make better use of the sites.
While the 5 Green Star requirement had been dropped, the new release included requirements for EV charging, energy efficiency, solar PV, climate-resilient landscaping, and gas-free development.
Envisioned as a bustling, high-density hub, the site offers 4000 sqm of commercial space tailored for offices, shops, cafes, and accommodation.
The sale also includes requirements to deliver 88 affordable dwellings and 25 public housing dwellings.
The SLA said Core Developments will now progress the project through planning, design and approval processes, with an opportunity for public comment through this process.

















